Kids Camp Progress
Left click on picture to enlarge them and then scroll through
the various days progress by pressing next at the top.  You will 
note the date on the bottom and information on what the progress was.

Please contact us with your custom requests, and we will prepare a free estimate.
Or for more information, call us at:  905-261-6373

Or send inquiries to:
   320 Fralicks Beach Rd
   Port Perry, Ontario L9L1B6
Day 1-October 25, 2011  DemolitionDay 1-October 25, 2011  DemolitionDay 1-October 25, 2011  DemolitionDay 1-October 25, 2011  DemolitionDay 3-October 27, 2011  ExcavationDay 4-October 28, 2011  Laying out and framing the footings.Day 4-October 28, 2011  Framing up the footingsDay 4-October 28, 2011  Framing up the footingsNovember 3, 2011  Setting up the wall formsNovember 4, 2011  The wall forms  are stripped off.November 4, 2011  The wall forms  are stripped off.November 4, 2011  The wall forms  are stripped off.November 4, 2011  The wall forms  are stripped off.  This photo shows the dining area.November 7, 2011  November 9, 2011   Grading around the buildingNovember 10, 2011  Starting to build the walls.November 11, 2011  Knee walls are constructed on the poured walls.November 14, 2011  Rough grade on the South side of the new structure.November 14, 2011  Rough grade on Leahy Lane.November 14, 2011  Grade on the southwest side of the building  showing the downward slope towards the animal pens.November 14, 2011  Grading on the walkout basement.November 15, 2011  Basement with plumbing roughed in for bathrooms and laundry.November 15, 2011  Basement walkout.November 15, 2011  Sub floor on.November 17, 2011   Deck side of building.November 17, 2011  Walk out with exterior walls complete.November 17, 2011  South side November 17, 2011  Interior walls being built.November 23, 2011

The walls are up....ready for the trusses tomorrow.November 24, 2011

All the trusses are on the roof.  They are 55' long so as you can see a crane was on hand to hoist them up over the tree.November 24, 2011

A gable end, fully sheeted waiting to be hoisted by the crane.November 25, 2011

The gable end is up and lots of interior roof bracing done today.November 25, 2011

The gable end is up and lots of interior roof bracing done today.Dec 1 & 2 plywood on roof.Dec 1 & 2  Adding plywood to roofDec 5, 2011Dec 5, 2011Dec 6, 2011 windows and doors installed.Dec 6, 2011  Windows and Door installedDec 6, 2011  Windows and Door installedDec 7th   Note the tar paper dated 1852-1900 stating "Our Work Survives"  We kept this piece of heritage for you.Dec 7th...Shingles on the RoofDec 7th  Interior with windows in and Lake in the background.January 4, 2012

Roughed in storage areasJanuary 4, 2012

Roughed in bathrooms in basement.January 9, 2012

The outside walls of the dining area.January 9, 2012

The inside of the dining area.January 11, 2012January 11, 2012January 11, 2012January 13th...Here you will see the windows and door are installed in the dining/kitchen area.January 24th...Here you will note the siding has been completed.January 24th...Here you will note the siding has been completed.January 24th...Here you will note the siding has been completed.January 24th...Here you will note the siding has been completed.January 25th, 2011

 North side entrance shown with new deck (a snowy day).January 25th, 2011

Siding, fascia and eases trough complete on new addition. North side front entrance shown.January 25th, 2011

Siding, fascia and eases trough complete on new addition. North side is showing with new deck and temporary stairs added.January 25th, 2011

Siding, fascia and eases trough complete on new addition.Feb 2nd 2012  Drywall boarding complete.  The front entrance is shown here.Feb 2nd 2012  Drywall boarding complete.  The dining room is shown here.Week ending Feb 10, 2012. Downstairs drywall is being completed.Week ending Feb 10, 2012. Downstairs drywall is being completed.Week ending Feb 10, 2012. Downstairs drywall is being completed.